• ATIS T1.TRQ.9-2003

ATIS T1.TRQ.9-2003

Support of Crankback in Both ISUP & BICC

The Alliance for Telecommunications Industry Solutions , 01/01/2003

Publisher: ATIS

File Format: PDF

$30.00$60.00


This requirements document describes how a network fabric and switch logic would implement the Crankback capability. This capability enables ISUP and BICC signalling to use another egress path from among multiple egress paths when the first egress path used is busy. The Automatic Re-Routing (ARR) parameter in the IAM or Release message will instruct the receiving switch to invoke or inhibit Crankback functionality. The determination of whether to set the ARR parameter or pass a received ARR parameter will be governed by a set of cause codes received in a Release message, as well as a Crankback Treatment specified by each switch on a per-trunk group basis.

More Standards PDF

ATIS 1000099

ATIS 1000099

$15.00 $30.00

AWS NAVSEA B2.1-1/8-325:2020
AWWA C713-19

AWWA C713-19

$70.00 $140.00

AWWA C702-19

AWWA C702-19

$70.00 $140.00