• BS PD IEC TR 63368:2024

BS PD IEC TR 63368:2024

Control and protection systems for high-voltage direct current (HVDC) power transmission systems. Off-site real-time simulation testing

BSI Group , 10/31/2024

Publisher: BS

File Format: PDF

$155.00$310.00


This document provides guidance on off-site real-time simulation tests of control and protection (C&P) systems for HVDC power transmission systems. The off-site real-time simulation tests are carried out after the testing of C&P devices and prior to on-site system tests.

This document covers point-to-point, back-to-back, and multi-terminal HVDC systems of line commutated converters (LCC), voltage-sourced converters (VSC) and hybrid HVDC technologies.

In order to provide practical guidance for the functional performance tests of HVDC power transmission systems, this document covers the test environment, the contents and methods of functional performance tests, and the test report.

More Standards PDF

SAE MA2039A

SAE MA2039A

$18.00 $37.00

SAE J2403_201206

SAE J2403_201206

$76.00 $153.00

SAE AMS5933

SAE AMS5933

$33.00 $66.00

SAE AMS6303H

SAE AMS6303H

$33.00 $66.00