Applies to pressurized water reactors (PWRs) of VVER design and presents the requirements for monitoring adequate cooling within the core during hot and cold shutdown conditions. Requirements are given for core cooling monitoring instrumentation to ensure the safe operation of VVERs during abnormal operation and during and after design basis accidents (DBA).
More Standards PDF
IEEE 2740-2020
$37.00 $75.00
IEC 62271-213 Ed. 1.0 b:2021
$183.00 $367.00
IEEE 2861-2021
$29.00 $59.00
IEC 62271-106 Ed. 2.0 en:2021
$227.00 $455.00





