• IEC 62746-10-3 Ed. 1.0 b:2018

IEC 62746-10-3 Ed. 1.0 b:2018

Systems interface between customer energy management system and the power management system - Part 10-3: Open automated demand response - Adapting smart grid user interfaces to the IEC common information model

International Electrotechnical Commission , 07/10/2018

Publisher: IEC

File Format: PDF

$110.00$221.00


IEC 62746-10-3:2018 defines and describes methods and example XML artefacts that can be used to build a conformant adapter to enable interoperation between a utility distributed automation or demand response (DR) system based on the IEC common information model (CIM) and a utility smart grid user interface (SGUI) bridge standard (e.g., IEC 62746-10-1) to a customer facility. The scope is restricted to a method to define payload mappings between any specific CIM profile that contains DR/DER information models and the SGUI bridge standards including IEC 62746-10-1.
A

More Standards PDF

IEC 62642-2-72 Ed. 1.0 b:2015
IEEE C37.243-2015

IEEE C37.243-2015

$52.00 $104.00

IEC 60691 Ed. 4.0 b:2015

IEC 60691 Ed. 4.0 b:2015

$164.00 $329.00

IEC 61290-1-1 Ed. 3.0 b:2015