IEEE 2420-2019

IEEE Standard Criteria for Combustion Turbine-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations

IEEE , 06/18/2020

Publisher: IEEE

File Format: PDF

$34.00$68.00


IEEE 2420-2019 PDF

This standard describes the criteria for the application and testing of combustion turbine-generator units as Class 1E standby power supplies in nuclear power generating stations. Figure 1 shows the boundaries of systems and equipment included in the scope of this standard. Site testing is covered in Clause 7, and the boundaries for site testing are given in 1.1.2. The purpose of this standard is to provide the principal design criteria, design features, testing, and qualification requirements for the individual combustion turbine-generator units that enable them to meet their functional requirements as a part of the standby power supply under the conditions produced by the design basis events cataloged in the Plant Safety Analysis. New IEEE Standard - Active. The criteria for the application and testing of combustion turbine-generator units as Class 1E standby power supplies in nuclear power generating stations are described in this standard.

More Standards PDF

IEC 60050-445 Ed. 1.0 b:2002
IEC 62356-1 Ed. 1.0 en:2003

IEC 62356-1 Ed. 1.0 en:2003

$168.00 $337.00

IEC 60050-444 Ed. 1.0 b:2002
IEC 60603-7-1 Ed. 1.0 b:2002