NEMA BS 31001-2021

Electric Submeter System Commissioning

National Electrical Manufacturers Association , 12/01/2021

Publisher: NEMA

File Format: PDF

$27.00$54.00


Describes the processes and documentation to be used in commissioning electricity sub-metering (ESM). The scope of this document includes on-site verification of labeling, wiring, communications, and proper circuit assignments for accurate energy consumption measurement. It is intended to be the basis of a NEMA commissioning certification program.

More Standards PDF

JIS C 1283-1:2009

JIS C 1283-1:2009

$58.00 $116.00

JIS Z 8909-3:2008

JIS Z 8909-3:2008

$29.00 $58.00

JIS C 2820:2008

JIS C 2820:2008

$37.00 $75.00

JIS D 9301:2008

JIS D 9301:2008

$59.00 $119.00