The purpose of this guideline is to describe when and why potholing is utilized for construction and design activities, potholing methods, advantages and disadvantages of the methods included, and one-call resources. Potholing may be utilized, as required and described herein, to prevent excavation damage to underground utilities and to avoid unknown foreign utilities.
More Standards PDF
PIP CTCE1000
$75.00 $150.00
PIP INTG1000
$75.00 $150.00
PIP PCCCV002
$50.00 $100.00
PIP ELCGL01D-EEDS
$62.00 $125.00








