The purpose of this guideline is to describe when and why potholing is utilized for construction and design activities, potholing methods, advantages and disadvantages of the methods included, and one-call resources. Potholing may be utilized, as required and described herein, to prevent excavation damage to underground utilities and to avoid unknown foreign utilities.
More Standards PDF
PIP PCERE001
$57.00 $115.00
PIP PN06CL1S01
$37.00 $75.00
PIP CTSC1000
$75.00 $150.00
PIP PCSPA001
$25.00 $50.00








