• API RP 1168:2008

API RP 1168:2008

Pipeline Control Room Management, First Edition

American Petroleum Institute , 09/01/2008

Publisher: API

File Format: PDF

$70.00$140.00


This document provides pipeline operators and pipeline controllers with guidance on industry best practices on control room management to consider when developing or enhancing practices and procedures. This document was written for operators with continuous and non-continuous operations, as applicable. This document addresses four pipeline safety elements for hazardous liquid and natural gas pipelines in both the transportation and distribution sectors: pipeline control room personnel roles, authorities and responsibilities; guidelines for shift turnover; pipeline control room fatigue management; and, pipeline control room management of change (MOC).

API RP 1168:2008 History

API RP 1168 (R2021)

API RP 1168 (R2021)

$50.00 $101.00

API RP 1168:2008

API RP 1168:2008

$70.00 $140.00

More Standards PDF

API RP 1595 (R2019)

API RP 1595 (R2019)

$129.00 $259.00

API RP 5LT (R2024)

API RP 5LT (R2024)

$33.00 $67.00

API TR 17TR5

API TR 17TR5

$55.00 $110.00

API TR 17TR6

API TR 17TR6

$55.00 $110.00