• AWWA M28

AWWA M28

M28: Rehabilitation of Water Mains

American Water Works Association , 01/01/2001

Publisher: AWWA

File Format: PDF

$56.00$113.00


This operations manual provides guidance on selecting the best water-main rehabilitation techniques for your water distribution system. Step-by-step guidance, including costing, is included for the following methods.

Cleaning: flushing, cable-attached devices, pigs and other fluid-propelled cleaning devices, and power boring devices.

Lining: cement-mortar lining, epoxy lining, conventional slip-lining, close-fit slip-lining, and cured-in-place lining techniques.

Replacment: Trenchless pipe replacement using pipe-bursting technology

AWWA M28 History

AWWA M28

AWWA M28

$61.00 $122.00

AWWA M28

AWWA M28

$56.00 $113.00

More Standards PDF

ATIS 0200008

ATIS 0200008

$70.00 $140.00

AWWA C907-12

AWWA C907-12

$70.00 $140.00

AWS B2.3/B2.3M:2012

AWS B2.3/B2.3M:2012

$44.00 $89.00

ATIS 0800031

ATIS 0800031

$102.00 $205.00