• IEC 61850-7-410 Ed. 2.0 b:2012

IEC 61850-7-410 Ed. 2.0 b:2012

Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

International Electrotechnical Commission , 10/30/2012

Publisher: IEC

File Format: PDF

$208.00$417.00


IEC 61850-7-410:2012 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant.

IEC 61850-7-410 Ed. 2.0 b:2012 History

IEC 61850-7-410 Ed. 2.1 b:2015
IEC 61850-7-410 Ed. 2.0 b:2012
IEC 61850-7-410 Ed. 1.0 en:2007

More Standards PDF

IEC 62443-4-1 Ed. 1.0 b:2018
IEEE 1527-2018

IEEE 1527-2018

$52.00 $104.00

IEEE 2050-2018

IEEE 2050-2018

$147.00 $295.00

ICC NC-BC-2018

ICC NC-BC-2018

$60.00 $121.00