IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
IEC 62382 Ed. 2.0 b:2012 History
IEC 62382 Ed. 3.0 b:2024
$122.00 $245.00
IEC 62382 Ed. 2.0 b:2012
$95.00 $190.00
IEC 62382 Ed. 1.0 en:2006
$58.00 $116.00
More Standards PDF
IEC 61241-10 Ed. 1.0 b:2004
$64.00 $128.00
IEC 60079-18 Ed. 2.0 b:2004
$71.00 $143.00
IEC 60439-4 Ed. 2.0 b:2004
$58.00 $116.00
IEC 60085 Ed. 3.0 b:2004
$16.00 $32.00








