This SAE Information Report SAE J2836/2\uT\uM establishes use cases and general information for communication between plug-in electric vehicles and the DC Off-board charger. Where relevant, this document notes, but does not formally specify, interactions between the vehicle and vehicle operator.
This applies to the off-board DC charger for conductive charging, which supplies DC current to the vehicle battery of the electric vehicle through a SAE J1772\uT\uM Hybrid coupler or SAE J1772\uT\uM AC Level 2 type coupler on DC power lines, using the AC power lines or the pilot line for PLC communication, or dedicated communication lines that is further described in SAE J2847/2.
The specification supports DC energy transfer via Forward Power Flow (FPF) from grid-to-vehicle.
The relationship of this document to the others that address PEV communications is further explained in section 5.
This is the 1st version of this document and completes step 1 effort that captures the initial objectives of the SAE task force. The intent of step 1 was to record as much information on ?what we think works? and publish. The effort continues however, to step 2 that allows public review for additional comments and viewpoints, while the task force also continues additional testing and early implementation. Results of step 2 effort will then be incorporated into updates of this document and lead to a republished version.
This applies to the off-board DC charger for conductive charging, which supplies DC current to the vehicle battery of the electric vehicle through a SAE J1772\uT\uM Hybrid coupler or SAE J1772\uT\uM AC Level 2 type coupler on DC power lines, using the AC power lines or the pilot line for PLC communication, or dedicated communication lines that is further described in SAE J2847/2.
The specification supports DC energy transfer via Forward Power Flow (FPF) from grid-to-vehicle.
The relationship of this document to the others that address PEV communications is further explained in section 5.
This is the 1st version of this document and completes step 1 effort that captures the initial objectives of the SAE task force. The intent of step 1 was to record as much information on ?what we think works? and publish. The effort continues however, to step 2 that allows public review for additional comments and viewpoints, while the task force also continues additional testing and early implementation. Results of step 2 effort will then be incorporated into updates of this document and lead to a republished version.
SAE J2836/2_201109 History
SAE J2836/2_202308
$53.00 $106.00
SAE J2836/2_201109
$54.00 $109.00
SAE J2836/2_201109
$50.00 $100.00
More Standards PDF
SAE J57_201405
$43.00 $87.00
SAE AS3177A
$22.00 $44.00
SAE AMS5764E
$33.00 $66.00
SAE CPGM2_16LT4CTS
$500.00 $1,000.00








