This document is intended to clarify key aspects of the operation of Project 25 subscriber, base, and repeater station equipment in the interests of conformance.
It includes a set of PCP items or procedures for basic conventional operation as follows:
PCP 1.1 – Voice Calls
-
PCP 1.1.1 – Group Call via Repeater Operation
-
PCP 1.1.2 – Individual Call via Repeater Operation
-
PCP 1.1.3 – Group Call Direct Operation
-
PCP 1.1.4 – Individual Call Direct Operation
It is consistent with other pertinent APCO Project 25 Conformance Profiles, namely:
Project 25 Conformance Profile – Level 2 (Advanced Conventional Operation)
Project 25 Conformance Profile – Level 3 (Basic Trunking Operation)
Project 25 Conformance Profile – Level 4 (Advanced Trunking Operation)
Project 25 Conformance Profile – Level 5 (Phase II Trunking Operation)
This document is primarily aimed at manufacturers and conformance test facilities to serve as a standard reference of conformant air interface signaling, as a means of assisting manufacturers in the development of conformant Project 25 equipment. It also defines a framework against which manufacturers may describe the conformant behaviour of their Project 25 products
It is not designed as a functional interoperability test suite for end users, for which readers are referred to [7].
This document assumes an audience familiar with terms and definitions contained in the APCO P25 standards.
TIA TIA-102.CAEA-A History
TIA TIA-102.CAEA-A
$77.00 $155.00
TIA TIA-102.CAEA
$77.00 $155.00
More Standards PDF
UL 60950-22
$179.00 $359.00
UOP 1015-17
$120.00 $240.00
UL 2129
$315.00 $631.00
UOP 1014-17
$120.00 $240.00







