This document is intended to clarify key aspects of the operation of Project 25 subscriber, base, and repeater station equipment in the interests of conformance.
It includes a set of PCP items or procedures for basic conventional operation as follows:
PCP 1.1 – Voice Calls
• PCP 1.1.1 – Group Call via Repeater Operation
• PCP 1.1.2 – Individual Call via Repeater Operation
• PCP 1.1.3 – Group Call Direct Operation
• PCP 1.1.4 – Individual Call Direct Operation
It is consistent with other pertinent APCO Project 25 Conformance Profiles, namely:
Project 25 Conformance Profile – Level 2 (Advanced Conventional Operation)
Project 25 Conformance Profile – Level 3 (Basic Trunking Operation)
Project 25 Conformance Profile – Level 4 (Advanced Trunking Operation)
Project 25 Conformance Profile – Level 5 (Phase II Trunking Operation)
This document is primarily aimed at manufacturers and conformance test facilities to serve as a standard reference of conformant air interface signaling, as a means of assisting manufacturers in the development of conformant Project 25 equipment. It also defines a framework against which manufacturers may describe the conformant behavior of their Project 25 products.
It is not designed as a functional interoperability test suite for end users, for which readers are referred to [7].
This document assumes an audience familiar with terms and definitions contained in the APCO P25 standards.
TIA TIA-102.CAEA History
TIA TIA-102.CAEA-A
$77.00 $155.00
TIA TIA-102.CAEA
$77.00 $155.00
More Standards PDF
ULC 710.1:2019
$25.00 $50.00
ULC 115
$125.00 $250.00
ULC 124
$125.00 $250.00
TIA ANSI/TIA-5050
$53.00 $107.00





